
From the Double helix to the linear slope
by Architekturbuero HaberzRefurbishment of the Styrian politics headquarter "Grazer Burg" which has been finished in 2000. Glass and steel have been used as main materials and a huge glass wall has been especially manufactured for the design of the lift. The whole refurbishement has been designed to be fully disability accessible.
Address: Hofgasse 15, 8010 Graz, Österreich
Architect: Michael Haberz
Client: County of Styria
Structural engineer: Manfred Petschnigg Manfred Petschnigg
Consulting by: Kunst: Joachim Baur / Werkstadt Graz
Technik: Joanneum Research, Institut für digitale Bildverarbeitung - Alexander Nischlwitzer, Robert Ladstätter, Christian Esser / Fa. Mahlsch
Interface: Wolfgang Reinisch, Norbert Math
Sound: Klammer & Gründler Duo
Glastechnik: Herbert Maierhofer, 8641 St.Marein/Mzt.
Planing stage: 1997–1998
Implementation: 1999–2000
Copyright for photographs: Paul Ott, more information under: www.paul-ott.at
http://www.parasite-net.eu/project/from_the_von_der_double_helix_to_the_linear_slope
Bookmark it: